110kV Substation of Son My 3.1 Solar Power Plant

  • Location:
    Vinh Tan commune, Tuy Phong district, Binh Thuan province
  • Total investment:
    23.927 tỷ đồng (1,104 tỷ USD)
  • Designed Capacity:
    1 x 600 MW
  • Commencement:
    4/2016
  • Status:
    Completed in December 2019
  • Investor:
    EVN
Chia sẻ: