  • Location:
    In the force of Dong Nai river basin in the downstream area of ​​Dong Nai 4 hydropower plant (Dak R'Tih stream branch)
  • Designed Capacity:
    148MW
  • Status:
    Unit 1 of the superior plant generates commercial electricity on October 2, 2011.
    On August 27, 2011, unit 2 of the superior plant produced commercial electricity on August 30, 2011.
    Unit 3 of the lower-level plant produced commercial electricity on September 16, 2011.
    Unit 4 of the lower-level plant generates commercial electricity on October 19, 2011
  • Investor:
    Construction Corporation No. 1
  • Scope of Work:
    Prepare Feasibility Study Report