THIEN TAN 1.3 SOLAR PROJECT

  • Location:
    Phuoc Ha commune, Thuan Nam district, Ninh Thuan province
  • Designed Capacity:
    50 MWp
  • Status:
    Operating 12/27/2020
  • Investor:
    Ninh Thuan Energy Industry Joint Stock Company – T&T Group
  • Scope of Work:
    Services provided: Operation management, maintenance of the plant and 220kV substation
Thien Tan 1.3 solar power plant was built on the bed of Lanh Ra lake, the whole project is located in the area of ​​​​the lake bed flooded all year round, so the construction faced many difficulties. In the context of the complicated developments of the Covid-19 epidemic and the weather in Ninh Thuan in the last days of the year met with heavy rain, PECC2POM promptly dispatched a team of experienced engineers to support the investor to complete the project. COD factory in 2020 after only 02 months of construction. With the dedication and professionalism of the O&M team, PECC2POM is committed to providing the factory with stable, safe, reliable operation with the highest efficiency and availability.
Chia sẻ: