Vinh Tan 4 Extension Thermal Power Plant

  • Location:
    Vinh Tan Village, Tuy Phong District, Binh Thuan Province
  • Total investment:
    23.927 Billion VND (1,104 Billion USD)
  • Designed Capacity:
    1 x 600 MW
  • Commencement:
    April,2016
  • Status:
    Operation in December, 2019
  • Investor:
    EVN
Chia sẻ: